Documentation
product Pre-releaseunwritten sections are marked
Reference
Tables you look up mid-task.
Quality codes
not yet writtenThe full lattice and its OPC UA mapping.
Capability catalogue
not yet writtenEvery grantable capability, with scope rules.
Non-goals
not yet writtenWhat the system deliberately does not do — spec 00 §4.
Glossary
not yet writtenThe vocabulary, including the PI translations.
This section is planned but not yet written — the abstracts above are the commitment, not the documentation. The Introduction and the PI engineer’s guide are written and current.